🔒 Free sign-up to watch · 2:29 “Which revision went to the contractor?” is one of the most expensive questions in practice. If the answer takes more than a minute, or depends on who you ask, there is a document control problem. On site, the cost of building from the wrong drawing can be far larger than the fee for the whole stage.
Good document control is not complicated. It is four habits applied every time.